ATF 220 G-5 EM 3B

Category: 

When it comes to cranes for lifting, and especially in the 5-axle cranes category, there is no better option than the ATF 220G-5. The high load capacity combined with a 68 m main boom and an axle load of 12 t ensures utilization and applications up to the 6-axle class. This generates enormous income opportunities.

The boom extensions can be bent mechanically or hydraulically. As the bending is made at the main boom head, the ATF 220G-5 can be placed close to buildings and lift loads far beyond the edges of a building due to the 20 or 40 degree bending of the boom extensions. Here, competitors are required to rig complex jibs. The installation close to the buildings also ensures a short working radius so that the full range of the load charts can be used and less construction site space is blocked by the crane.

The success of these cranes over the past 6 years proves that this concept is a cost-effective alternative. Check it by yourself!

Model

Tadano Faun ATF 220G-5 EM 3B. www.tadanofaun.en

Model: Tadano Faun ATF 220G-5 EM 3B

Max. Lifting capacity Max. Sheave height  Max. radius
1 220 t 109 m  84 m

Max Traveling Speed 85 km-h. / Dimensions: Length: 15.12 m. Width: 3.0 m. Height: 3.99 m. / Engine: Mercedes Benz (Euromot III B, EPA Tier 4i)
carrier: 405 kW (551 HP) / superstructure: 143 kW (194 HP) / Boom: 13.2 m – 68 m. / Boom extension: 5.4 m – 37.2 m. / Boom extension HTLJ: 10.35 m – 22.85 m (hydraulically telescopable and offset 5° to 60°) / Gearing mechanism: ZF-AS-Tronic 16 AS 2602. / Gear: 10 x 8 x 10 (10 x 6 x 10 option)

Model: Tadano Faun ATF 220G-5 EM 3B

The boom extensions can be bent mechanically or hydraulically. As the bending is made at the main boom head, the ATF 220G-5 can be placed close to buildings and lift loads far beyond the building’s edges thanks to the 20 or 40 degree bending of the boom extensions. Here, competitors are required to rig complex jibs. The installation close to the buildings also ensures a short working radius so that the full range of the load charts can be utilised and less construction site space is blocked by the crane.